This content requires the Macromedia Flash Player.  Download  Free Flash Player Now. The content above requires the latest Macromedia Flash Player. Download Free Flash Player Now.


Explore
Construction Timetable
Photo Gallery
Animation
Project Detail Map
News & Resources

Question of the Month
How often do you anticipate crossing the John James Audubon Bridge when it is complete?
Daily
Approximately 3 times per week
Once per week
A few times per month
Rarely
 
Submit | View Results
Tell Us What You Think
map detail Map Detail

 


Bridge Construction News
The first permanent construction on the John James Audubon Bridge project began October 12 with the driving of the first pile for Bridge No. 8.

Bridge No. 8 is the nearest bridge on the roadway alignment to the US 61 access in West Feliciana Parish.

For detailed information on construction progress, please visit:

Current Activity/Progress  

Bridge Overview
The John James Audubon Bridge project is a new Mississippi River crossing between Pointe Coupee and West Feliciana parishes in south central Louisiana.

The bridge--proposed to be the longest cable-stayed bridge in North America when complete--will replace an existing ferry between the communities of New Roads and St. Francisville.

The bridge will also serve as the only bridge structure on the Mississippi River between Natchez, Mississippi and Baton Rouge, Louisiana (approximately 90 river miles).

The Audubon Bridge project will include:

  • A 2.44 mile four-lane elevated bridge structure with two 11-foot travel lanes in each direction with 8-foot outside shoulders and 2-foot inside shoulders
  • Approximately 12 miles of two-lane roadway connecting LA 1 east of Hospital Road at New Roads to US 61 south of LA 966 and St. Francisville
  • Four new intersections at existing LA 1, LA 10, LA 981 (River Road) and US 61 for entry to and exit from the new roadway and bridge
The project is being constructed by Audubon Bridge Constructors, a joint venture of Flatiron Constructors, Granite Construction and Parsons Transportation Group.

The John James Audubon Bridge project is expected to be complete by summer 2010.

 

Louisiana Timed Program - Time is Now!
LA Timed Home | Bridge Projects Home | Huey P. Long Bridge | John James Audubon Bridge | Florida Avenue Bridge
John James Audubon Bridge: Overview | Current Activity / Progress | Press Room | Community Awareness | History | FAQs
Louisiana Timed Program Bridge Projects Home Huey P. Long Bridge John James Audubon Bridge Florida Avenue Bridge Overview Current Activity / Progress Press Room Community Awareness History Frequently Asked Questions